US Rt. 219 Bridge Backstay Anchors

Project Details
Location: Town of Springville, New York
Client: Cold Springs Construction, Inc.
Client Contact: Mr. Jeff Younger
716-542-2011
Project Gallery
McMahon & Mann Consulting Engineers, P.C. (MMCE) worked with Cornell and Company Inc. and the general contractor, Cold Springs ConstructionCorp. todesign of the backstay anchors for construction of the new US. Rt. 219 arch bridge over Cattaraugus Creek.
The backstay anchors hold up the arch bridge as it is erected. They consist of eight anchorages, four on each side of the gorge. Each anchorage consists of a reinforced concrete block, supported by steel piles and tied back to the abutment with 3 - 1 ¼ high strength steel rock anchors that extend 50 feet into the gorge face.