Excavation Shoring Design
Cambridge Wastewater Treatment Plant
McMahon & Mann completed subsurface exploration and field and laboratory testing programs to characterize the site for an expansion to an existing wastewater treatment plant. The site is underlain by granular soil deposits with relatively high permeability. Construction of several tanks and a pump building required excavations extending 15 to 20 feet below the groundwater level.