McMahon & Mann Consulting Engineering and Geology, P.C.

Tonawanda Creek at West Phalinger Remediation

Share |


Tonawanda Creek at West Phalinger Remediation
Project Details
Location: Clarence, New York
Client: Greenman-Pedersen, Inc. for Erie County Department of Public Works
Client Contact: Mr. Glenn Blake, 716-633-4844

Project Gallery

  • Photo 1
  • Photo 2
  • Photo 3
  • Photo 4
  • Photo 5
  • Photo 6
  • Photo 7
  • Photo 8
  • Photo 9
  • Photo 10
  • Phtoto 11
  • Photo 12
  • Photo 13

A slope failure along Tonawanda Creek damaged a portion of Tonawanda Creek Road between Transit Road and Westphalinger Road in the Town of Clarence. A section of Tonawanda Creek Road, approximately 250 feet long dropped about 10 feet and pushed soil into Tonawanda Creek. Subsurface explorations indicated that a thick deposit of soft clay was beneath the road.

McMahon & Mann developed design recommendations for remediating the soft clay conditions. Mixing dry cement with the soft clay soils to increase the strength and decrease the compressibility of the soft clay deposit was the selected remediation. We completed stability analysis to determine the amount of improvement that was required to support the reconstructed roadway. Based on the stability analysis, McMahon & Mann developed design plans showing the extent of the dry soil mixing improvements. We provided construction monitoring services throughout the project.  The project was completed in the winter and early spring of 2009.  





Website by Luminus
© 2023 McMahon & Mann Consulting Engineering and Geology, P.C. All Rights Reserved.